River bed raised Ichamati River



ichamati river @ basirhat city


while bed of ichamati river 4.3 metres (14 ft) higher of mathabhanga, of churni lower mathabhanga 15 centimetres (6 in). during lean period level of water in mathabhanga higher of padma. result, no water enters ichamati during dry season. 1 of causes of silting of river construction of guard wall railway on bridge. river beds in area need excavated in order there flow of water during lean season. since required done both in india , bangladesh, there need accord on point. matter has been discussed @ ministerial level, area surveyed have better idea of problems of people in affected area, , decisive action expected in near future.



the ichamati taki-saidpur




bibhutibhushan bandopadhyay

ichamati river @ bangaon town


the river zone faces problem of industrial pollution , forcible occupation of land people. arresting environmental hazards resulting lack of sanitation facilities, encroachment, groundwater contamination arsenic pollution, destruction of aquatic flora, fauna of burning problem of areas needs tackled through participatory mechanism.


ichhamati river , branches form large oxbow lake complex near bangaon in north 24-paraganas district. besides agricultural , anthropogenic stresses, weed infestation particularly water hyacinth (eichhornia crassipes) major concern because covering surface of lake waters.








Comments

Popular posts from this blog

In literature Socialist realism in Romania

Flipnote creation Flipnote Studio 3D

How CURP codes are built Unique Population Registry Code