Construction Pont Neuf



painting of pont neuf project approved king henry iii in 1578. bridge completed in 1607 less ornate design.



the pont neuf in 1615, (map of paris matthäus merian)



the pont neuf in 1763, nicolas-jean-baptiste raguenet


as 1550, henry ii asked build bridge here because existing pont notre-dame overloaded, expense @ time.


in february 1578, decision build bridge made henry iii laid first stone in 1578, year when foundations of 4 piers , 1 abutment completed. pierre des isles, 1 of builders, convinced supervisory commission bridge, straight, more resistant river currents, if 2 sections built @ slight angle, change adopted in may 1578.


further design changes made during summer of 1579. first, number of arches changed 8 , 4 7 , five. not problem on north side, nothing had been built, on south, 4 piles , abutment on left bank laid, addition of fifth arch necessitated reducing length of platform on island, terre-plein, 28.5 toises 19. second, decided allow houses built on bridge (though never were). required widening of bridge. remaining piers built on next 9 years. after long delay beginning in 1588, due political unrest , wars of religion, construction resumed in 1599 under reign of henry iv. bridge opened traffic in 1604 , completed in july 1606. inaugurated henri iv in 1607.


like bridges of time, pont neuf constructed series of many short arch bridges, following roman precedents. first stone bridge in paris not support houses in addition thoroughfare, , fitted pavements protecting pedestrians mud , horses; pedestrians step aside bastions let bulky carriage pass. decision not include houses on bridge can traced directly henry iv, decided against inclusion on grounds houses impede clear view of louvre, newly built galerie du bord de l eau linked tuileries palace.


the bridge had heavy traffic beginning; long time widest bridge in paris. has undergone repair , renovation work, including rebuilding of 7 spans in long arm , lowering of roadway changing arches semi-circular elliptical form (1848–1855), lowering of sidewalks , faces of piers, spandrels, cornices , replacing crumbled corbels closely originals possible. in 1885, 1 of piers of short arm undermined, removing 2 adjacent arches, requiring them rebuilt , foundations strengthened.


a major restoration of pont neuf begun in 1994 , completed in 2007, year of 400th anniversary.